JG80LT Crawler Excavator with sleeper changer
The railway sleeper changer is mainly used for the replacement of sleepers during overhaul and sleeper replacement. The applicable sleeper types are wood sleepers, 69, Type II and Type III concrete sleepers. The equipment is of road rail dual-use type, which is convenient for getting on and off the track, and can be quickly started and braked on the track. It is flexible in operation, high in accuracy, fast in response, and does not cause damage to the rails. The vehicle runs stably and reliably.
The special chassis of our patented sleeper changer is adopted, and the overall structure is strengthened. The operating device is mainly composed of a sleeper grabbing mechanism and a ballast raking mechanism. The sleeper grabbing mechanism and the ballast raking mechanism can achieve 90 ° switching, and the sleeper grabbing mechanism can achieve 360 ° free rotation. The design of the sleeper mechanism is reasonable to minimize the damage to the surface quality of the concrete sleeper when ensuring the stability of the sleeper.
SPECIFICATIONS |
RANGE OF OPERATION |
Boom length |
3300mm |
Arm length |
1850mm |
Maimum digging force |
45KN |
Back-end radius of gyration |
1800mm |
Max. Opening Width of Grab |
650mm |
Min. Opening Width of Grab |
200mm |
Max. RADIUS Grabing Weight |
0.5~0.6t |
Max,Width of Grab |
2800mm(customizable) |
Grapple rotation angle |
360° |
DIMENSION |
(Length*width*height) travel position |
6100*2800*2650mm |
Wheel base |
2600mm |
Track Gauge |
1570mm |
Width Of Crawler |
400mm |
Ground clearance of counterweight |
780mm |
Min ground clearance |
280mm |
TECHNICAL PARAMETERS |
Applicable railway gauge |
1435mm(customizable) |
efficiency |
≥40pic/h |
Angle of rotation |
360° |
Machine weight |
8000kg |
Engine model |
YUCHAI |
Rated Power |
48KW |
Rated Speed |
2200r/min |
Hydraulic system working pressure |
21Mpa |
Hydraulic system flow |
120L/min |
Metering gear pump |
2*28ml/r |
Max Hauling force |
45KN |
(High speed/low speed) |
4.5/2.5km/h |
Grade Climbing ability |
70%/35° |
Volume Of Bucket |
0.25m3 |
Revolution Overdrive Pressure |
16Mpa |
Full circle swinging time |
5.5s |
Fqt Fuel Quantity |
≥4L/h |
Capacity Of The Fuel Tank |
110L |
Hydraulic Tank Capacity |
110L |
The operating efficiency after using the Jingong railway pillow replacement machine can reach 20 manual workers.
Its grab can be customized according to the actual width of customer's local sleepers.